Operational Area

IPC Terminal Petikemas Tanjung Priok

Tanjung Priok Port is the largest and busiest port in Indonesia. This port serves as the gateway for export-import goods trading and also interisland trading. It handles more than 30% of Indonesia’s non-oil and gas commodities. Fifty percent (50%) of the goods flow into and out of Indonesia passes through the Tanjung Priok Port. The busy and large flow of goods has made Tanjung Priok Port a barometer of the Indonesian economy.

The complete intermodal facilities at Tanjung Priok Port can boost logistics distribution and connect Tanjung Priok Port with all cities in Indonesia. Its strategic location with a hinterland, an area of trading and industrial activities, makes Tanjung Priok Port as the main port on Java Island. With modern technology and facilities, Tanjung Priok Port is able to serve the latest generation of ships that go directly to various international trade centers (direct call).

At Tanjung Priok Port, PT IPC Container Terminal has 3 Container Terminal Operation Areas, namely Tanjung Priok I Area, Tanjung Priok II Area, and the Terminal Support Area.

Facilities

Tanjung Priok I

URAIAN ZONA 1 ZONA 2 ZONA 3
Dermaga 009 103-105 107-113
Length 404 M 462.45 M 1103.44 M
Width 26.25 M 19.5 M 107 ( 19.5 M )
108 ( 25.5 M )
109 – 113 ( 22 M )
Area 10,065 M² 9,009 M² 24,656 M²
Draft -10 M -12 M 107-109 (-12m)
110 ( – 11 M )
111 ( – 11 M )
112 ( – 11 M )
113 ( – 11 M )
 ZONA 1ZONA 2ZONA 3
Luas54,026 M²69,097 M²89,350 M²
Ground Slot1,331 GS1,339 GS1,584 GS
CY Capacity5,210 Teus6,294 Teus7,669 Teus
ZONA 1 ZONA 2 ZONA 3
Quay Crane 3 Unit  4 Unit 3 Unit
Harbour Mobile Crane 3 Unit
Rubber Tyred Gantry Crane 5 Unit *11 Unit 4 Unit
Rail Mounted Gantry Crane 4 Unit
Reach Stacker 1 Unit 3 Unit 2 Unit
Side Loader 3 Unit
Head Truck 9 Unit 17 Unit 20 Unit

Tanjung Priok II

PIER BERTH (M’) LENGHT (M’) 5 M from Berth 10 M from Berth Area
208 1010-840 170 -12.00 s/d -12.00 -12.00 s/d -12.00 Domestic
209 840-770 70 -12.00 s/d -12.00 -12.00 s/d -12.00 Domestic
210 640-440 200 -8.30 s/d -8.70 -8.60 s/d -9.80 Domestic
211 440-290 150 -8.70 s/d -10.00 -9.00 s/d -10.00 Domestic
212 290-130 160 -9.50 s/d -9.60 Domestic
213 130-00 130 -9.50 s/d -9.60 Domestic
300 00-200 200 -11.50 s/d -12.00 -12.00 s/d -12.80 Ocean Going
301 200-340 140 -12.40 s/d -13.80 -12.40 s/d -13.80 Ocean Going
302 340-500 160 -12.90 s/d -14.00 -12.80 s/d -13.50 Ocean Going
303 500-660 160 -12.00 s/d -13.00 -13.00 s/d -13.80 Ocean Going
304 660-870 210 -12.00 s/d -13.30 -12.00 s/d -13.00 Ocean Going
305 870-1010 140 -11.50 s/d -12.20 -13.00 s/d -14.10 Ocean Going
NumberFacilitiesArea (M2)
123
Domestic Yard  
1207-X16.578
2208-20916.497
3208 Ex. RORO3.952
4210-2119.030
521314.906
Domestic Yard Total 61.143
Domestic Yard Capacity (Teus) 8.860
Oceangoing Yard  
130014.476
2301-30257.520
33037.976
430415.585
530524.365
Oceangoing Yards Total 122.922
Oceangoing Yard Capacity (Teus) 10.568
EQUIPMENTOCEANGOING (unit)DOMESTION (Unit)
QCC94
HMC27
RMGC5
RTGC1014
Reach Stacker105
Internal Truck4933
Side Loader2
VENDORPanel (Plug)Capacity (KVA)
QJA (Utara)12100
QJA (Utara)72250
QJA (Utara)20500
QJA (Timur)860
QJA (Timur)32350
TRANSPORINDO (Utara)
144350
TRANSPORINDO (Selatan)
210380

Terminal Support

Non TPS 217 X 219 X 223X
Luas 43.827 M² 14.579 M² 9.624 M²
Ground Slot 939 GS 217 GS 159 GS
CY Capacity 4.710 Teus 661 Teus 623 Teus
Kegiatan Extend Storage Yard, Reefer Plug Stuffing/Stripping, Extend Storage Yard Extend Storage Yard
Jenis Alat Lapangan Keterangan
217 X 219 X 223 X
RTGC (Unit) 4 1
RS (Unit) 1 1 1 (mobile) RS Mobile dari Lapangan 219X ke 223X
SL (Unit) 1  –  –
Forklift 3 ton (Unit) 1 1 (mobile) Forklift 3 Ton Mobile dari Lapangan 225X/219X ke 221X/223X untuk kegiatan behandle
Forklift 5 ton (Unit) 1 (mobile) Forklift 5 Ton Mobile dari Lapangan 225X ke 219X
Kapasitas Plug Efektif Lapangan Kapasitas (KVA)
25 Plug 217 X 380